< Project - Industrial

Client: Henry Boot Developments
Architect: The Harris Partnership
Contractor: Kier Northern
Value: £6 million
This 3.8 hectare site lies in an Environment Agency (EA) Source Protection Zone 1, adjacent to a groundwater abstraction point. Accordingly, the EA adopted a highly stringent approach to the potential for soil / water contamination at the site. Integra undertook negotiation with the EA following a series of sophisticated environmental numerical analyses. As a result, remedial treatment of site groundwater was totally avoided and remediation of site soils was limited to localised removal of heavily impacted hydrocarbon contaminated soils associated with leakage from a previous underground diesel storage tank.
|
|
|
|
|