Client: GB Developments
Architect: Carless Adams Partnership
Contractor: Lawrence Baker
Value: £7.5 million

101 bedroom, three storey load bearing masonry care home facility with upper floors formed using precast, pre-stressed concrete floor units. Due to existing variable ground conditions, the foundations were formed utilising continuous flight auger piling techniques whilst the underground surface water drainage solution utilised sustainable drainage techniques.

Civil
Integra Consulting Engineering Manchester
Structural
Integra Consulting Engineering Manchester
Highways
Integra Consulting Engineering Manchester
Geotechnical
Integra Consulting Engineering Manchester
Environmental